Loading..

Fulham Prep School

Fulham

At the Fulham Preparatory school we undertook extensive structural works to the 1890’s building to create a new upper loft / floor mezzanine comprising of three new classroom spaces.

Works included a new steel supporting structure constructed in existing classrooms to support the new timber joisted upper floor, creation of a new access stair, and the fitting out of all classrooms for the start of the new school term.

Elsewhere in the building, the second floor classrooms and all corridor spaces had new ceilings installed. In addition a new performance hall was created and feature acoustic ceilings were installed in both the performance and main hall.

Initial works were carried out whilst the school was occupied to allow the fit out works to be undertaken during the summer break.

Lets work together