This project is the first phase in the modernisation of the Exchange Shopping Centre in Putney. The works are concentrated in the existing atrium which currently houses two scenic lifts and stair access to three floors and a rooftop car park. Works include the removal of the existing atrium lifts and stair structure, along with the strip out of the adjacent retail units including shop fronts.

New works will include the installation of two new lift cores and lifts, extensions to the floor plates and a new feature stair to all floors. Finishes will include new balustrading, ceilings, floor tiling to the entire first floor and part of the ground floor and new glazed shop fronts to all levels.

Following the formation of a temporary customer access, all works are being carried out in the live shopping centre behind a 15m high temporary screen, and access to the works is via the basement car park.

Overall this scheme will increase the retail area of the centre by in excess of 2,500 sq ft.

The Exchange is to remain live and fully operational throughout the duration of our works and we will ensure that there is no detrimental effect on customers or retailers as a result.

Lets work together