St. Mary’s House

Reading

This project involved the removal of concrete panels, windows and associated cladding at first, second and third floor levels.

Replacement with brick slip & zinc cladding, windows and spandrel panels, all with associated framing and insulation was also undertaken by Oakmont, whilst retaining the existing interior blockwork walls.

Secondary glazing, dropped ceilings and associated fixings also made up part of the contracted works.

There were also a number of concrete repairs undertaken to the existing structure.