Loading..

This scheme saw Oakmont successfully deliver a high quality refurbishment and CAT A fit out to a nine storey office building.

Works encompassed the removal of large areas of the external structure and installing curtain walling from the ground to seventh floor. Oakmont also installed large full height glazing in an area of the top three floors.

The entrance stairway was completely removed from the second floor down to the ground floor, and a bespoke steel and glass staircase was installed in its place which featured natural stone treads which carried onto the remainder of the staircase.

Lets work together